Rio Level

13/03/2026
meters
0

Situation

Filling

Fill: 4.00cm
Filled up to this day
5.87m

Quiet

close in the cribs

TORRES: 29.95m / ROADWAY: 29.05m / PLATAFORMA MALCHER: 13.11m / PAREDAN: 5.79m

Infrastructure

Areas

Area: 77,660,48 m2
Floating area: 16.763.05 m2
Total area: 94,423,53 m2

Access channel depth: 13,5m
Depth in the quay on the leak (outer area): 18.0m
Depth at the pier in the flood (outer area): 35,0m

Cots of docking

Roadway: 1 (one) for 1(one) vessel
Torres: 2 (two) for 3(3) vessels
Fixed Cradles: 3 (three) for 3 (three) vessels

Length of docks

Fixed
Wall: 289.45 m
Malcher platform: 293.00 m
Note: Only in a given period of the year (full)

Floating
Roadway: 253.00m
Torres: 360.45m

Wares

Warehouse number 23: 2,166,30m2
Warehouse number 20: 1,476.88m2
Warehouse number 15: 680.65m2
Water station: 4.266.80m2
Warehouse number 07: 960.00m2
Warehouses at 0, 3 and 4: 7,967.92m2

Courtyards

Container Terminal(154m x 139m): 21.406 m2
Wall: 18,747,18 m2
Floating area: 16.763.05 m2

Bridges

(02) access to floating cap. 70t

Other

100mm drinking water network for ship supply
Power grid 380 Volts
Rio’s reading rule Black

EnglishenEnglishEnglish